Indian sandstone paving in Barnsley

Grey Indian sandstone patio outside the back door.
How we build them
We dig patios out to at least 150mm and build them on compacted MOT Type 1, or MOT Type 3 where drainage is a concern. Every slab goes down on a full bed of mortar (sand, cement and water), with SBR applied to the back of each one so it bonds to the bed, and the joints are filled with resin grout in the colour you choose. Most patios take 2 to 4 days.



