Patio paving in Selby

Buff flagged path with a red block border and gravel strips, between two red block paved drives, in Selby

Flagged path with a red block border and gravel strips between two block paved drives.

How we build them

We dig patios out to at least 150mm and build them on compacted MOT Type 1, or MOT Type 3 where drainage is a concern. Every slab goes down on a full bed of mortar (sand, cement and water), with SBR applied to the back of each one so it bonds to the bed, and the joints are filled with resin grout in the colour you choose. Most patios take 2 to 4 days.

More patio jobs

Next step

Free site visit and a written quote. The price is fixed before we start.

We promise to reply to every enquiry within the hour.