Tarmac driveway in Harrogate

Tarmac driveway with a buff and charcoal block border, curving round the front steps and down the side to the garage.
How we build them
Every drive we build is dug out to at least 200mm. Most go on a compacted MOT Type 1 sub-base; where the drive needs to drain through, we use MOT Type 3 instead. Most drives take 3 to 5 days.





